当前位置:首页 » 作文翻译 » 支架现浇怎么翻译的用英语

支架现浇怎么翻译的用英语

发布时间: 2024-11-17 19:52:53

❶ 英语船舶翻译

Waterproof curtain, steel sheet pile, pile up three deep, lining, drains, floor corridor, earth excavation, steel rod installed, guided filtering layer, pouring, cast-in-place beams, surface layer, prefabricated components, utility trench , breastwork

❷ 阀门英文资料怎么翻译

DESIGN:
1. The valve shall be constructed with a two-piece body rated for 150 or 300 psi and with end flanges in full conformance with ANSI B16.1 Class 125 or Class 250. The main body section and end piece shall contain integrally cast support feet and lifting lugs.
此阀门应为两片式结构,适应压力150或300psi。端法兰必须完全满足ANSI B16.1标准中class 125或250LB的尺寸内要求容。支撑脚和吊耳必须与阀体和连接体整体铸在一起。

不好意思,剩余的晚点翻。

❸ 建筑工程专业英语翻译,高手进!

This is designed to Xining city of Jinhua Residential District on the 3rd floor, engineering, construction sites in Xining city in Qinghai Province Beichuan River to the forefront of the West Bank two bands, for the six-storey structure of brick and concrete structure, based on a foundation wall under the bar. Design features include four parts: the first part of architectural design; into the second structural design; seismic checked into Part III, Part IV into the design basis.
According to architectural design of residential architectural design standards, the use of functional requirements of residential building elevation layout and structural effects of the reasonableness of the decision of the room into the hall and deep size. Structural design of the structure in accordance with design specifications of the formula designed walls, stairs and various components, including cast-in-place reinforced by hand-counting, some rooms selection of prefabricated panels. According to seismic design specifications, checking calculation method used seismic shear at the bottom, horizontal shear walls earthquake rigid distribution by the middle of floor, wall seismic shear vertical distribution of a rigid floor, wall section checked only for the most disadvantaged of the wall For checking, checking the other wall of the structure using CAD Guangsha checking. According to the design basis for building the foundation design specifications established basement minimum size calculation, based on the specific choice of size standards in Qinghai Province Atlas, and then checking the basis of the bearing capacity and rigid angle.

热点内容
单词画报的英语怎么写 发布:2024-11-17 22:03:09 浏览:31
程序终止英语怎么说及英文单词 发布:2024-11-17 21:45:48 浏览:255
制服控英语怎么翻译 发布:2024-11-17 21:13:24 浏览:638
他喜欢的朋友一起玩英语怎么说 发布:2024-11-17 21:11:32 浏览:313
根本不喜欢爬山用英语怎么说 发布:2024-11-17 20:50:26 浏览:672
四年四年级下册一封英语信怎么写 发布:2024-11-17 20:21:40 浏览:799
英语翻译我快要高考了英语怎么说 发布:2024-11-17 20:14:52 浏览:358
我喜欢小狗翻译英语怎么说 发布:2024-11-17 20:01:38 浏览:99
支架现浇怎么翻译的用英语 发布:2024-11-17 19:52:53 浏览:298
热熔胶英语怎么说及英语单词 发布:2024-11-17 19:44:31 浏览:256