怎麼用英語寫一篇游泳館的介紹
❶ 水立方的英文介紹,謝謝。
Located in the Beijing Olympic park, the national aquatics center, also known as "Water Cube", is the main swimming pool built for the 2008 summer Olympic Games and one of the landmark buildings of the 2008 Beijing Olympic Games.
Its design scheme is the "water cube" ([H2O]3) generated by the global design
competition. It and the national stadium (commonly known as the bird's nest) are on both sides of the northern end of the central axis of Beijing, forming a relatively complete image of Beijing as a famous historical and cultural city.
The construction area of the national swimming center is planned to be 62,950 square meters, with a total construction area of 65,000-80,000 square meters.
The construction area of the underground part is not less than 15,000 square meters, and the length, width and height are 177m ×177m ×30m respectively.
譯文:
國家游泳中心又稱「水立方」(Water Cube)位於北京奧林匹克公園內,是北京為年夏季奧運會修建的主游泳館,也是2008年北京奧運會標志性建築物之一。
它的設計方案,是經全球設計競賽產生的「水的立方」([H2O]3)方案。其與國家體育場(俗稱鳥巢)分列於北京城市中軸線北端的兩側,共同形成相對完整的北京歷史文化名城形象。
國家游泳中心規劃建設用地62950平方米,總建築面積65000-80000平方米,其中地下部分的建築面積不少於15000平方米,長寬高分別為 177m ×177m ×30m。
(1)怎麼用英語寫一篇游泳館的介紹擴展閱讀:
鳥巢(國家體育館)
體育場由雅克·赫爾佐格、德梅隆、艾未未以及李興剛等設計,由北京城建集團負責施工。體育場的形態如同孕育生命的「巢」和搖籃,寄託著人類對未來的希望。設計者們對這個場館沒有做任何多餘的處理,把結構暴露在外,因而自然形成了建築的外觀。
2003年12月24日開工建設,2008年3月完工,總造價22.67億元 。作為國家標志性建築,2008年奧運會主體育場,國家體育場結構特點十分顯著。體育場為特級體育建築,大型體育場館。主體結構設計使用年限100年,耐火等級為一級,抗震設防烈度8度,地下工程防水等級1級。
2014年4月中國當代十大建築評審委員會從中國1000多座地標建築中,綜合年代、規模、藝術性和影響力四項指標,初評出二十個建築。
最終由此產生十大當代建築。北京鳥巢——國家體育場為初評入圍建築之一 。作為北京2022年冬奧會冰上項目場館,國家體育場改造工程將於2020年初開工。
❷ 英語作文外國友人想學游泳請你介紹有什麼游泳館
My hobby is swimming. I like swimming because of the three main reasons. Firstly, I can do more exercise. After the exercise, I will become stronger. Secondly, swimming can rece my pressure. I always feel less stressful after swimming. Finally, swimming can help me to make more friends. Once, when I standed on a side of swimming pool a lady asked me to teach her how to swim faster. I taught her some basic knowledge of swimming and made friend with her. After that, she and I had dinner together. The above three reasons are the major points why I love swimming. In conclusion, I like swimming very much.
❸ 用英語寫游泳館規定(至少5條)
一、貴重物品要寄存,如不寄存,發生丟失,後果自負.
二、游泳人員必須經強制淋浴沖身和洗腳消毒後入池.
三、游泳人員必須佩戴泳帽;嚴禁穿拖鞋進入游泳區.
四、聽從管理人員指揮,初學者嚴禁進入深水區.
五、嚴禁將毛巾、肥皂等非游泳器材帶入池內,嚴禁在池內搓身,以保持泳池的清潔.
譯文:A,want to check the valuables,such as not happened,hosting,lost the consequences.
Second,swimming by personnel must compulsory shower blunt body and wash feet into the pool after disinfection.
Three,swimming the personnel must wear swimming cap; It is strictly prohibited to wear slippers into the area.
Four,and obey the command,and management personnel are not allowed to enter the deep water area for beginners.
Five,against the towel,soap,etc the swimming pool is strictly prohibited equipment into,in the pool,to keep the body rub swimming pool clean.
❹ 寫關於水立方和鳥巢的英語小短文 不超過50個詞 在線等!!!!!!!!!!!!!!
不好意思剛剛沒有看清你的要求
國家游泳中心又被稱為「水立方」(Water Cube),位於北京奧林匹克公園內,是北京為2008年夏季奧運會修建的主游泳館,也是2008年北京奧運會標志性建築物之一。奧運會賽時,「水立方」的座椅將達到1萬7千個,其中,1萬1千個坐席將在奧運會後拆除,在剩下的6千個坐席中,有2千個是活動座椅,長期固定的坐席數為4千個。這樣的設計為賽後利用留下了充足的空間。
The country swims the center to be called 「the water cube」 (Water Cube), located at Beijing Olympics park, is Beijing is the main natatorium which in 2008 summer Olympics construct, is also in 2008 one of Beijing Olympic Games symbolic buildings. When Olympic Games match, 「water cube」 the chair will achieve 17,000, 11,000 seats after the Olympic Games demolishes, in is left over in 6000 seats, some 2000 moves the chair, the long-term fixed seat number is 4000. Such design to use after the game has left behind the sufficient space.
❺ 用英文介紹游泳館50字
Dear swimming pool administrator,
I would like to make a suggestion. I think that all people at swimming pools should wear caps. If not, sometimes people's hair fall out and it pollutes the pool. It is not good. It makes the cleanup more difficult. It is also bad for the sanitation of the pool. It worsens the environment for other swimmers.
Yours,
Li Ming
❻ 鳥巢 水立方的英語介紹
Venue Name: National Stadium (Bird's Nest)
Building Venue: Olympic Park
Building area (million ㎡): 25.8, the number of seats: 80,000 permanent seats, 11,000 temporary seats
Function of the events: track and field, soccer
After the function: international and domestic sports competition and cultural, recreational activities
Starting Time: 2003.12.24
Building roof stadium saddle-shaped surface, long axis to 332.3 meters, 296.4 meters for the short axis, the highest height of 68.5 meters, the lowest height of 42.8 meters.
Symbolic significance: the Chinese traditional culture methods hollowing, ceramics lines, the brilliant red and warm, and modern most advanced steel structure design perfectly blending together
National Swimming Center, also known as the "Water Cube" (Water Cube), Olympic Park in Beijing, the Beijing 2008 Summer Olympic Games for the construction of the main swimming pool, but also the 2008 Beijing Olympics, one of landmark buildings. Its design, is a global design competition created "water cube" ([H2O] 3) program. December 2003 24 starts, is expected to be completed in October 2007 inspection. Its relationship with the National Stadium (commonly known as bird's nest) are shown in the northern end of Beijing City on both sides of the central axis, a relatively common form a complete historical and cultural city in the image of Beijing. National Swimming Center, the planning and construction of 62,950 square meters of land, with a total building area of 65000-80000 square meters, of which the underground sections of the building area of not less than 15,000 square meters, respectively dimensions 177m × 177m × 30m. Has been received from more than 90 countries and regions more than 330,000 Hong Kong, Macao and Taiwan Compatriots and Overseas Chinese contributions to more than 800 million yuan, of which Cheng Yu-tung, CHENG Kar-shun father and son and their businesses have donated 50 million yuan.
【Investment: about 1.02 billion
【Building area (㎡): 79,532 square meters
【Number of seats: permanent seats for the 4000, 2000 can be dismantled, and 11,000 temporary seats
【Purposes ring the Olympic Games: Swimming, diving, synchronized swimming, water polo
【Purposes ring the Paralympic Games: swimming, diving, synchronized swimming, water polo
【Owner units: Beijing State-owned Assets Operation Co., Ltd.
【Design units: Medium SEKKEI Commonwealth
【Total package units: one in the Council's Capital Construction Development Co., Ltd.
Purposes: in 2008 ring the Olympic Games, National Swimming Center for swimming, diving, synchronized swimming, water polo competition, etc., can accommodate seating 17,000 spectators, including permanent seating for 6000 spectators, the Olympic Games ring the temporary addition of 11,000 seats (after the removal of ). After the match will be built into the international advanced level, and set swimming, sports, fitness and leisure center in one.
譯文
場館名稱:國家體育場(鳥巢)
建設地點:奧林匹克公園
建築面積(萬㎡):25.8、座席數:永久座席80000個,臨時性座席11000個
賽時功能:田徑、足球
賽後功能:國際國內體育比賽和文化、娛樂活動
開工時間:2003.12.24
體育場建築頂面呈鞍形,長軸為332.3米,短軸為296.4米,最高點高度為68.5米,最低點高度為42.8米。
象徵意義:中國傳統文化中鏤空的手法、陶瓷的紋路、紅色的燦爛與熱烈,與現代最先進的鋼結構設計完美地相融在一起
國家游泳中心又被稱為「水立方」(Water Cube),位於北京奧林匹克公園內,是北京為2008年夏季奧運會修建的主游泳館,也是2008年北京奧運會標志性建築物之一。它的設計方案,是經全球設計競賽產生的「水的立方」([H2O]3)方案。2003年12月24開工,預計在2007年10月竣工驗收。其與國家體育場(俗稱鳥巢)分列於北京城市中軸線北端的兩側,共同形成相對完整的北京歷史文化名城形象。國家游泳中心規劃建設用地62950平方米,總建築面積65000-80000平方米,其中地下部分的建築面積不少於15000平方米,長寬高分別為 177m × 177m × 30m.目前已經收到來自90多個國家和地區的33萬多港澳台僑同胞的捐款8億多元人民幣,其中鄭裕彤、鄭家純父子及屬下企業曾捐贈五千萬元人民幣。
【投資】:約為10.2億
【建築面積(㎡)】:79532平方米
【座席數】:永久座席為4000個,2000個可拆除的,臨時性座席11000個
【奧運會期間的用途】:游泳、跳水、花樣游泳、水球
【殘奧會期間的用途】:游泳、跳水、花樣游泳、水球
【業主單位】:北京市國有資產經營有限責任公司
【設計單位】:中建設計聯合體
【總包單位】:中建一局建設發展有限公司
用途:2008年奧運會期間,國家游泳中心承擔游泳、跳水、花樣游泳、水球等比賽,可容納觀眾坐席17000座,其中永久觀眾坐席為6000座,奧運會期間增設臨時性座位11000個(賽後將拆除)。賽後將建成為具有國際先進水平的、集游泳、運動、健身、休閑於一體的中心。
❼ 用英語介紹2008年北京奧運會的主游泳館-水立方
國家游泳中心又被稱為「水立方」(Water Cube),位於北京奧林匹克公園內,是北京為2008年夏季奧運會修建的主游泳館,也是2008年北京奧運會標志性建築物之一。它的設計方案,是經全球設計競賽產生的「水的立方」([H2O]3)方案。2003年12月24開工,在2008年1月28日竣工。其與國家體育場(俗稱鳥巢)分列於北京城市中軸線北端的兩側,共同形成相對完整的北京歷史文化名城形象。國家游泳中心規劃建設用地62950平方米,總建築面積65000-80000平方米,其中地下部分的建築面積不少於15000平方米,長寬高分別為 177m × 177m × 30m。到目前,來自101個國家和地區的35萬多港澳台同胞及海外僑胞共捐獻了8.5億人民幣。其中鄭裕彤、鄭家純父子及屬下企業曾捐贈五千萬元人民幣。
The country swims the center to be called 「the water cube」 (Water Cube), located at Beijing Olympics park, is Beijing is the main natatorium which in 2008 summer Olympics construct, is also in 2008 one of Beijing Olympic Games symbolic buildings. Its design proposal, has 「the water cube」 after the global design competition ([H2O]3) the plan. in the December, 2003 24 operations, were completed in January 28, 2008. It (is named bird nest) with the national stadium to pass in review northmost part Beijing city axle the both sides, forms the relatively complete Beijing historical city image together. The country swims the central plan construction land 62950 square meters, total floor space 65000-80000 square meters, underground portion's floor space many in 15000 square meters, the length and breadth high respectively is 177m * 177m * 30m. To present, has altogether contributed 850,000,000 Renminbi from 101 national and the local more than 350,000 compatriots from Hong Kong and the overseas compatriots. And Zheng Yutong, the Zheng Jiachun fathers and sons and the subordinate enterprise once donated 50,000,000 Yuan.